The average running time of RT tasks is used to estimate the remaining compute
capacity for CFS tasks. This remaining capacity is the original capacity scaled
down by a factor (aka scale_rt_capacity). This estimation of available capacity
must also be invariant with frequency scaling.
A frequency scaling factor is applied on the running time of the RT tasks for
computing scale_rt_capacity.
In sched_rt_avg_update(), we now scale the RT execution time like below:
rq->rt_avg += rt_delta * arch_scale_freq_capacity() >> SCHED_CAPACITY_SHIFT
Then, scale_rt_capacity can be summarized by:
scale_rt_capacity = SCHED_CAPACITY_SCALE * available / total
with available = total - rq->rt_avg
This has been been optimized in current code by:
scale_rt_capacity = available / (total >> SCHED_CAPACITY_SHIFT)
But we can also developed the equation like below:
scale_rt_capacity = SCHED_CAPACITY_SCALE - ((rq->rt_avg << SCHED_CAPACITY_SHIFT) / total)
and we can optimize the equation by removing SCHED_CAPACITY_SHIFT shift in
the computation of rq->rt_avg and scale_rt_capacity().
so rq->rt_avg += rt_delta * arch_scale_freq_capacity()
and
scale_rt_capacity = SCHED_CAPACITY_SCALE - (rq->rt_avg / total)
arch_scale_frequency_capacity() will be called in the hot path of the scheduler
which implies to have a short and efficient function.
As an example, arch_scale_frequency_capacity() should return a cached value that
is updated periodically outside of the hot path.
Signed-off-by: Vincent Guittot <vincent.guittot@linaro.org>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Acked-by: Morten Rasmussen <morten.rasmussen@arm.com>
Cc: Morten.Rasmussen@arm.com
Cc: dietmar.eggemann@arm.com
Cc: efault@gmx.de
Cc: kamalesh@linux.vnet.ibm.com
Cc: linaro-kernel@lists.linaro.org
Cc: nicolas.pitre@linaro.org
Cc: preeti@linux.vnet.ibm.com
Cc: riel@redhat.com
Link: http://lkml.kernel.org/r/1425052454-25797-6-git-send-email-vincent.guittot@linaro.org
Signed-off-by: Ingo Molnar <mingo@kernel.org>
static unsigned long scale_rt_capacity(int cpu)
{
struct rq *rq = cpu_rq(cpu);
- u64 total, available, age_stamp, avg;
+ u64 total, used, age_stamp, avg;
s64 delta;
/*
total = sched_avg_period() + delta;
- if (unlikely(total < avg)) {
- /* Ensures that capacity won't end up being negative */
- available = 0;
- } else {
- available = total - avg;
- }
+ used = div_u64(avg, total);
- if (unlikely((s64)total < SCHED_CAPACITY_SCALE))
- total = SCHED_CAPACITY_SCALE;
+ if (likely(used < SCHED_CAPACITY_SCALE))
+ return SCHED_CAPACITY_SCALE - used;
- total >>= SCHED_CAPACITY_SHIFT;
-
- return div_u64(available, total);
+ return 1;
}
static void update_cpu_capacity(struct sched_domain *sd, int cpu)
#ifdef CONFIG_SMP
extern void sched_avg_update(struct rq *rq);
+extern unsigned long arch_scale_freq_capacity(struct sched_domain *sd, int cpu);
+
static inline void sched_rt_avg_update(struct rq *rq, u64 rt_delta)
{
- rq->rt_avg += rt_delta;
+ rq->rt_avg += rt_delta * arch_scale_freq_capacity(NULL, cpu_of(rq));
sched_avg_update(rq);
}
#else