From 3a3a58d4068382cf2e05f5c8fd3a0587836dacec Mon Sep 17 00:00:00 2001 From: Luca Abeni Date: Mon, 18 May 2015 15:00:25 +0200 Subject: [PATCH] sched/dl/Documentation: Switch to American English This file previously mixed American and British English; switch to American for consistency. Signed-off-by: Luca Abeni Signed-off-by: Peter Zijlstra (Intel) Cc: Linus Torvalds Cc: Peter Zijlstra Cc: Thomas Gleixner Cc: henrik@austad.us Cc: juri.lelli@gmail.com Cc: raistlin@linux.it Link: http://lkml.kernel.org/r/1431954032-16473-3-git-send-email-luca.abeni@unitn.it Signed-off-by: Ingo Molnar --- Documentation/scheduler/sched-deadline.txt | 32 +++++++++++----------- 1 file changed, 16 insertions(+), 16 deletions(-) diff --git a/Documentation/scheduler/sched-deadline.txt b/Documentation/scheduler/sched-deadline.txt index 194664bb8bbf..af40d6cc776b 100644 --- a/Documentation/scheduler/sched-deadline.txt +++ b/Documentation/scheduler/sched-deadline.txt @@ -43,7 +43,7 @@ CONTENTS "deadline", to schedule tasks. A SCHED_DEADLINE task should receive "runtime" microseconds of execution time every "period" microseconds, and these "runtime" microseconds are available within "deadline" microseconds - from the beginning of the period. In order to implement this behaviour, + from the beginning of the period. In order to implement this behavior, every time the task wakes up, the scheduler computes a "scheduling deadline" consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then scheduled using EDF[1] on these scheduling deadlines (the task with the @@ -63,7 +63,7 @@ CONTENTS In more details, the CBS algorithm assigns scheduling deadlines to tasks in the following way: - - Each SCHED_DEADLINE task is characterised by the "runtime", + - Each SCHED_DEADLINE task is characterized by the "runtime", "deadline", and "period" parameters; - The state of the task is described by a "scheduling deadline", and @@ -78,7 +78,7 @@ CONTENTS then, if the scheduling deadline is smaller than the current time, or this condition is verified, the scheduling deadline and the - remaining runtime are re-initialised as + remaining runtime are re-initialized as scheduling deadline = current time + deadline remaining runtime = runtime @@ -129,7 +129,7 @@ CONTENTS A typical real-time task is composed of a repetition of computation phases (task instances, or jobs) which are activated on a periodic or sporadic fashion. - Each job J_j (where J_j is the j^th job of the task) is characterised by an + Each job J_j (where J_j is the j^th job of the task) is characterized by an arrival time r_j (the time when the job starts), an amount of computation time c_j needed to finish the job, and a job absolute deadline d_j, which is the time within which the job should be finished. The maximum execution @@ -137,20 +137,20 @@ CONTENTS A real-time task can be periodic with period P if r_{j+1} = r_j + P, or sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally, d_j = r_j + D, where D is the task's relative deadline. - The utilisation of a real-time task is defined as the ratio between its + The utilization of a real-time task is defined as the ratio between its WCET and its period (or minimum inter-arrival time), and represents the fraction of CPU time needed to execute the task. - If the total utilisation sum_i(WCET_i/P_i) is larger than M (with M equal + If the total utilization sum_i(WCET_i/P_i) is larger than M (with M equal to the number of CPUs), then the scheduler is unable to respect all the deadlines. - Note that total utilisation is defined as the sum of the utilisations + Note that total utilization is defined as the sum of the utilizations WCET_i/P_i over all the real-time tasks in the system. When considering multiple real-time tasks, the parameters of the i-th task are indicated with the "_i" suffix. - Moreover, if the total utilisation is larger than M, then we risk starving + Moreover, if the total utilization is larger than M, then we risk starving non- real-time tasks by real-time tasks. - If, instead, the total utilisation is smaller than M, then non real-time + If, instead, the total utilization is smaller than M, then non real-time tasks will not be starved and the system might be able to respect all the deadlines. As a matter of fact, in this case it is possible to provide an upper bound @@ -160,13 +160,13 @@ CONTENTS maximum tardiness of each task is smaller or equal than ((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max where WCET_max = max_i{WCET_i} is the maximum WCET, WCET_min=min_i{WCET_i} - is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilisation. + is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilization. If M=1 (uniprocessor system), or in case of partitioned scheduling (each real-time task is statically assigned to one and only one CPU), it is possible to formally check if all the deadlines are respected. If D_i = P_i for all tasks, then EDF is able to respect all the deadlines - of all the tasks executing on a CPU if and only if the total utilisation + of all the tasks executing on a CPU if and only if the total utilization of the tasks running on such a CPU is smaller or equal than 1. If D_i != P_i for some task, then it is possible to define the density of a task as C_i/min{D_i,P_i}, and EDF is able to respect all the deadlines @@ -176,9 +176,9 @@ CONTENTS On multiprocessor systems with global EDF scheduling (non partitioned systems), a sufficient test for schedulability can not be based on the - utilisations (it can be shown that task sets with utilisations slightly + utilizations (it can be shown that task sets with utilizations slightly larger than 1 can miss deadlines regardless of the number of CPUs M). - However, as previously stated, enforcing that the total utilisation is smaller + However, as previously stated, enforcing that the total utilization is smaller than M is enough to guarantee that non real-time tasks are not starved and that the tardiness of real-time tasks has an upper bound. @@ -218,10 +218,10 @@ CONTENTS no guarantee can be given on the actual scheduling of the -deadline tasks. As already stated in Section 3, a necessary condition to be respected to - correctly schedule a set of real-time tasks is that the total utilisation + correctly schedule a set of real-time tasks is that the total utilization is smaller than M. When talking about -deadline tasks, this requires that the sum of the ratio between runtime and period for all tasks is smaller - than M. Notice that the ratio runtime/period is equivalent to the utilisation + than M. Notice that the ratio runtime/period is equivalent to the utilization of a "traditional" real-time task, and is also often referred to as "bandwidth". The interface used to control the CPU bandwidth that can be allocated @@ -251,7 +251,7 @@ CONTENTS The system wide settings are configured under the /proc virtual file system. For now the -rt knobs are used for -deadline admission control and the - -deadline runtime is accounted against the -rt runtime. We realise that this + -deadline runtime is accounted against the -rt runtime. We realize that this isn't entirely desirable; however, it is better to have a small interface for now, and be able to change it easily later. The ideal situation (see 5.) is to run -rt tasks from a -deadline server; in which case the -rt bandwidth is a -- 2.39.5